Recently, KEPPEL O&M received an order for FPSO-“Cidade de Mangaratiba MV24”, which is mainly responsible for the construction and integration of the upper block of the ship, including the construction of helicopter deck, torch tower, riser, and assembly. Tube, waste heat recovery unit, water injection unit and sulfate treatment unit.
It is reported that the order will be handled by Keppel's BrasFELS shipyard in Angola and is expected to be completed in the second half of 2014. The FPSO will be leased to the Dutch company Tupi BV for a 20-year project in southern Brazil. Keppel COO pointed out that the project is a joint venture between Mitsui Marine Development and Japan's Toyo Offshore Engineering Co., Ltd., and construction of the same type of ship was also carried out in February last year, and is scheduled to be completed in the fourth quarter of this year.

Glycoside Silicone Elastomer Gel

Glycoside Silicone Elastomer Gel,Cyclopentasiloxane (And) Caprylyl Dimethicone Ethoxy Glucoside (And) Dimethicone Crosspolymer,Caprylyl Trimethicone (And) Caprylyl Dimethicone Ethoxy Glucoside (And) Dimethicone Crosspolymer,D

Nanjing Manta New Material Co., Ltd. , https://www.mantasil.com